Performance Evaluation of Start-Up Decisions of Rapid-Start Units for AGC
- 6 January 2015
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 30 (6) , 3130-3138
Abstract
Generating units, participating in the secondary frequency control of a control area, are usually spinning units already connected to the network and operating outside their range of optimal performance. This paper deals with an alternative method of providing secondary frequency control called Rapid-Start (RS). It consists in assigning a regulation band to several off-line units (RS units) which are capable of being started and connected rapidly, therefore allowing the online units to operate closer to their nominal power. As RS operation may have economic benefits, an appropriate algorithm to start up an RS unit needs to be developed. This paper proposes a methodology to evaluate, compare, and choose the most appropriate RS algorithm among the ones developed for a certain AGC control area. An optimization model provides a reference by determining the hypothetically ideal start-ups and shut-downs of RS units. In addition, the definition of performance indexes to evaluate, compare, and choose the different RS algorithms is proposed. The proposed methodology is illustrated for a secondary frequency control zone within the Spanish power system by using real data signals.Keywords
This publication has 13 references indexed in Scilit:
- Start-Up Decision of a Rapid-Start Unit for AGC Based on Machine LearningIEEE Transactions on Power Systems, 2013
- Ancillary services market clearing simulation: A comparison between deterministic and heuristic methods2010
- Optimal dispatch of regulation reserves for power balance control in transmission system2009
- Cost/benefit and reliability studies on rapid-start units for energy/reserve contributions2009
- Connecting the Intraday Energy and Reserve Markets by an Optimal RedispatchIEEE Transactions on Power Systems, 2007
- Optimal Intraday Operation Strategy of Power Plants at Wholesale and Reserve Markets2007
- A Survey of Frequency and Voltage Control Ancillary Services—Part I: Technical FeaturesIEEE Transactions on Power Systems, 2007
- Assessment of Quick Start Resource Requirements in Market Operations2006
- Composite system spinning reserve assessment in interconnected systemsIEE Proceedings - Generation, Transmission and Distribution, 1995
- The Effect of Rapid Start and Hot Reserve Units In Spinning Reserve StudiesIEEE Transactions on Power Apparatus and Systems, 1972