Integrated scheduling optimization of production and transportation for precast component with delivery time window
Authors:
- 27 March 2023
- journal article
- research article
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 31 (8) , 3335-3355
Abstract
Purpose: Production and transportation of precast components, as two continuous service stages of a precast plant, play an important role in meeting customer needs and controlling costs. However, there is still a lack of production and transportation scheduling methods that comprehensively consider delivery timeliness and transportation economy. This article aims to study the integrated scheduling optimization problem of in-plant flowshop production and off-plant transportation under the consideration of practical constraints of customer order delivery time window, and seek an optimal scheduling method that balances delivery timeliness and transportation economy.Design/methodology/approach: In this study, an integrated scheduling optimization model of flowshop production and transportation for precast components with delivery time windows is established, which describes the relationship between production and transportation and handles transportation constraints under the premise of balancing delivery timeliness and transportation economy. Then a genetic algorithm is designed to solve this model. It realizes the integrated scheduling of production and transportation through double-layer chromosome coding. A program is designed to realize the solution process. Finally, the validity of the model is proved by the calculation of actual enterprise data.Findings: The optimized scheduling scheme can not only meet the on-time delivery, but also improve the truck loading rate and reduce the total cost, composed of early cost in plant, delivery penalty cost and transportation cost. In the model validation, the optimal scheduling scheme uses one less truck than the traditional EDD scheme (saving 20% of the transportation cost), and the total cost can be saved by 17.22%.Originality/value: This study clarifies the relationship between the production and transportation of precast components and establishes the integrated scheduling optimization model and its solution algorithm. Different from previous studies, the proposed optimization model can balance the timeliness and economy of production and transportation for precast components.Keywords
This publication has 18 references indexed in Scilit:
- Using Prefabricated Building to Address Housing Needs in Libya: A Study based on Local Expert PerspectivesArabian Journal for Science and Engineering, 2019
- Genetic algorithm for determining the construction logistics of precast componentsEngineering, Construction and Architectural Management, 2019
- Lean approach in precast concrete component productionBuilt Environment Project and Asset Management, 2019
- Life cycle energy performances and environmental impacts of a prefabricated building moduleRenewable and Sustainable Energy Reviews, 2018
- Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resourcesArchitectural Engineering and Design Management, 2017
- Minimizing makespan for scheduling stochastic job shop with random breakdownApplied Mathematics and Computation, 2012
- Precast production scheduling using multi-objective genetic algorithmsExpert Systems with Applications, 2011
- Production Scheduling for Precast Plants using a Flow Shop Sequencing ModelJournal of Computing in Civil Engineering, 2002
- An application of genetic algorithms to precast production schedulingComputers & Structures, 2001
- A capacity planning model for precast concrete building productsBuilding and Environment, 1993