Ring roads carry most peak-hour traffic in Gulf cities, where buses serve under 6% of trips. The eastern end of Kuwait’s Fourth Ring Road is among the country’s most congested junctions, yet upgrade plans rest on default parameters. We built a Simulation of Urban MObility (SUMO) model from turning counts and a field-measured saturation flow of 2056 passenger car units per hour per lane, reproduced within 0.4%. Nine options, covering signal control, approach widening, grade separation of through traffic, a 222 m reversible median lane in two configurations and three combinations, were run at current, +25% and +50% demand in both peaks, with emission modelling and a 30-year appraisal. The grade separation package (overpass, slip roads, residual signal) cut mean delay from 60.0 s to 12.3 s, moved the signal user delay proxy from level-of-service (LOS) band E to C, held LOS C at +50% demand and reduced carbon dioxide emissions by 19%; its benefit–cost ratio is 1.6, above unity only if demand grows. Actuation and widening together cut delay by 25% and postponed breakdown by about a decade (benefit–cost ratio 6). The reversible lane had no effect at any demand level because the signal, not the mainline, limits capacity.

This publication has 48 references indexed in Scilit: