Abstract
In this paper, we intended to explore three research questions related to applying just-in-time (JIT) manufacturing techniques in a job shop environment with the kanban-based production control. Simulation experiments were performed and the results were analysed using a statistical method, planned comparison. We found that the adoption of cellular layout in a job shop with the kanban system should only be considered if the amount of setup time reduction achievable through cellular manufacturing is medium to large; otherwise, functional layout should be adopted. In addition, moving parts in batches within cells was found to be more advantageous than moving parts one piece at a time. Only minor effects of material handling speed on the shop performance were identified.