Integrated management model of production and yard stock for in-situ precast concrete production
Open Access
- 23 November 2021
- journal article
- research article
- Published by Taylor & Francis in Journal of Asian Architecture and Building Engineering
- Vol. 22 (1) , 286-302
Abstract
In-situ production of precast concrete (PC) members is affected by various factors, such as cost, time, quantity, lead-time, number of molds, production cycle, number of cranes, and yard stock area. Particularly, the yard stock area constitutes over 84% of the total required area, considerably larger than the production area. This is important because in-situ production is not applicable if the yard stock area is not satisfied. However, most existing studies related to in-situ production of PC members have focused on the production area, and no study has specifically focused on the yard stock area. Therefore, research on in-situ production, considering various influencing factors centering on the yard stock area, is required. This study developed a system dynamics-based integrated management model of production and yard stock for in-situ production. Cost reduction up to 739,000 USD was demonstrated possible in a case project, wherein the yard stock area was 5,941m2. The influencing factors of in-situ production can be numerically controlled in the proposed model. It is thus possible to perform an effective simulation study and obtain appropriate values of the yard stock area, which varies during the project, under various scenarios based on the real site situations.Keywords
Funding Information
- Pusan National University (2021R1C1C2094527)
This publication has 27 references indexed in Scilit:
- Repertory grid technique in the development of Tacit-based Decision Support System (TDSS) for sustainable site layout planningAutomation in Construction, 2011
- In-situ Production Analysis of Composite Precast Concrete Members of Green FrameJournal of the Korea Institute of Building Construction, 2011
- Economic Order Quantity(EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard AvailabilityKorean Journal of Construction Engineering and Management, 2011
- Impact of Inaccurate Engineer’s Estimated Quantities on Unit Price ContractsJournal of Construction Engineering and Management, 2009
- A hybrid CAD-based construction site layout planning system using genetic algorithmsAutomation in Construction, 2003
- Improving Labor Flow Reliability for Better Productivity as Lean Construction PrincipleJournal of Construction Engineering and Management, 2003
- Probability Distribution Functions for Construction SimulationJournal of Construction Engineering and Management, 2000
- Genetic search for solving construction site-level unequal-area facility layout problemsAutomation in Construction, 2000
- Quantity Estimating of Building with Logarithm-Neuron NetworksJournal of Construction Engineering and Management, 1998
- Lessons from system dynamics modelingSystem Dynamics Review, 1987