Scheduling a maintenance activity to minimize total weighted completion-time
Authors:
- Gur MosheiovGMGur Mosheiov
- Assaf SarigASAssaf Sarig
- 1 February 2009
- journal article
- Published by Elsevier in Computers & Mathematics with Applications
- Vol. 57 (4) , 619-623
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- Scheduling a maintenance activity on parallel identical machinesNaval Research Logistics (NRL), 2008
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespanEuropean Journal of Operational Research, 2008
- Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespanComputers & Operations Research, 2008
- A two-machine flowshop scheduling problem with a separated maintenance constraintComputers & Operations Research, 2008
- Planning Machine Maintenance in Two-Machine Shop SchedulingOperations Research, 2006
- Minimizing total flow time in the single-machine scheduling problem with periodic maintenanceJournal of the Operational Research Society, 2006
- Single-machine scheduling with periodic maintenance and nonresumable jobsComputers & Operations Research, 2003
- Machine scheduling with a rate-modifying activityEuropean Journal of Operational Research, 2001
- Scheduling jobs and maintenance activities on parallel machinesNaval Research Logistics (NRL), 2000