A method for scheduling in parallel manufacturing systems with flexible resources
- 1 February 2000
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 32 (2) , 135-146
Abstract
We address the Parallel-Machine Flexible-Resource Scheduling (PMFRS) problem of simultaneously allocating flexible resources, and sequencing jobs, in cellular manufacturing systems where the cells are configured in parallel. We present a new solution methodology for the PMFRS problem called the Nested Partitions (NP) method. This method combines global sampling of the feasible region and local search heuristics. To efficiently apply the NP method we reformulate the PMFRS problem, develop a new sampling algorithm that can be used to obtain good feasible schedules, and suggest a new improvement heuristic. Numerical examples are also presented to illustrate the new method.Keywords
This publication has 12 references indexed in Scilit:
- Flow-line scheduling problem with controllable processing timesIIE Transactions, 1997
- Scheduling Parallel Manufacturing Cells with Resource FlexibilityManagement Science, 1996
- The Discrete Resource Allocation Problem in Flow LinesManagement Science, 1995
- Improved Algorithms for Machine Allocation in Manufacturing SystemsOperations Research, 1994
- Flow Shop Scheduling with Resource FlexibilityOperations Research, 1994
- Scheduling Multiple Variable-Speed MachinesOperations Research, 1994
- A state-of-the-art review of parallel-machine scheduling researchEuropean Journal of Operational Research, 1990
- Some Heuristics for Scheduling Jobs on Parallel Machines with SetupsManagement Science, 1990
- Machine allocation problems in manufacturing networksEuropean Journal of Operational Research, 1990
- Scheduling on machines with variable service ratesComputers & Operations Research, 1987