Scheduling many-task workloads on supercomputers: Dealing with trailing tasks
Authors:
- 1 November 2010
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-10
Abstract
In order for many-task applications to be attractive candidates for running on high-end supercomputers, they must be able to benefit from the additional compute, I/O, and communication performance provided by high-end HPC hardware relative to clusters, grids, or clouds. Typically this means that the application should use the HPC resource in such a way that it can reduce time to solution beyond what is possible otherwise. Furthermore, it is necessary to make efficient use of the computational resources, achieving high levels of utilization. Satisfying these twin goals is not trivial, because while the parallelism in many task computations can vary over time, on many large machines the allocation policy requires that worker CPUs be provisioned and also relinquished in large blocks rather than individually. This paper discusses the problem in detail, explaining and characterizing the trade-off between utilization and time to solution under the allocation policies of Blue Gene/P Intrepid at Argonne National Laboratory. We propose and test two strategies to improve this trade-off: scheduling tasks in order of longest to shortest (applicable only if task runtimes are predictable) and downsizing allocations when utilization drops below some threshold. We show that both strategies are effective under different conditions.Keywords
This publication has 13 references indexed in Scilit:
- Improving Resource Availability by Relaxing Network Allocation Constraints on Blue Gene/P2009
- Toward loosely coupled programming on petascale systems2008
- Bi-criteria Scheduling of Scientific Workflows for the Grid2008
- Development and validation of a modular, extensible docking program: DOCK 5Journal of Computer-Aided Molecular Design, 2006
- A Tool for Prioritizing DAGMan Jobs and Its Evaluation2006
- Scheduling Algorithms2004
- Job Scheduling for the BlueGene/L System2002
- Scheduling n Independent Jobs on m Uniform Machines with both Flowtime and Makespan Objectives: A Parametric AnalysisINFORMS Journal on Computing, 1995
- A Comparison of Multiprocessor Scheduling Heuristics1994
- Using dual approximation algorithms for scheduling problems theoretical and practical resultsJournal of the ACM, 1987