Fuzzy Model Tree for Early Effort Estimation
- 1 December 2013
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 2, 117-121
Abstract
Use Case Points (UCP) is a well-known method to estimate the project size, based on Use Case diagram, at early phases of software development. Although the Use Case diagram is widely accepted as a de-facto model for analyzing object oriented software requirements over the world, UCP method did not take sufficient amount of attention because, as yet, there is no consensus on how to produce software effort from UCP. This paper aims to study the potential of using Fuzzy Model Tree to derive effort estimates based on UCP size measure using a dataset collected for that purpose. The proposed approach has been validated against Tree boost model, Multiple Linear Regression and classical effort estimation based on the UCP model. The obtained results are promising and show better performance than those obtained by classical UCP, Multiple Linear Regression and slightly better than those obtained by Tree boost model.Keywords
All Related Versions
This publication has 8 references indexed in Scilit:
- Towards an early software estimation using log-linear regression and a multilayer perceptron modelJournal of Systems and Software, 2013
- A Treeboost Model for Software Effort Estimation Based on Use Case Points2012
- Software effort estimation based on optimized model tree2011
- Analogy-based software effort estimation using Fuzzy numbersJournal of Systems and Software, 2011
- Software Cost Estimation using Fuzzy Decision Trees2008
- Stochastic gradient boostingComputational Statistics & Data Analysis, 2002
- Toward a theory of fuzzy information granulation and its centrality in human reasoning and fuzzy logicFuzzy Sets and Systems, 1997
- Pattern Recognition with Fuzzy Objective Function Algorithms1981