In order to optimize the current construction process, this paper uses the ant algorithm to solve the construction process optimization problem. The cost, duration and carbon emission of construction are quantitatively analyzed by historical data, and then the data are input into the algorithm, and the algorithm is used to obtain the duration, cost and carbon emission of the best process. The final result proves the effectiveness of the ant algorithm. The established system and model would be carried out in the actual project to test its feasibility and effectiveness, so as to provide support for the scientific and reasonable development of the project schedule. At the same time, it would also promote the application of ant algorithm technology in the project construction and improve the efficiency of the project construction. By comparing and analyzing the average data of the process before optimization and the data after optimization, it was concluded that the average cost savings were 17.65; the average construction period was reduced by 9.82 minutes; the carbon emissions were reduced by 6.31 kg. The validity of the MOOM of green building construction process based on Ant Colony Algorithm(ACO) can be obtained through experimental analysis.

This publication has 19 references indexed in Scilit: