Combining petrov's heuristic and the CDS heuristic in group scheduling problems
Author:
- 31 December 1990
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 19 (1-4) , 457-461
Abstract
No abstract availableThis publication has 8 references indexed in Scilit:
- An extension of Palmer's heuristic for the flow shop scheduling problemInternational Journal of Production Research, 1988
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- An Evaluation of Flow Shop Sequencing HeuristicsManagement Science, 1977
- Complexity of Machine Scheduling Problems1977
- A Heuristic Algorithm for the n Job, m Machine Sequencing ProblemManagement Science, 1970
- Application of the Branch and Bound Technique to Some Flow-Shop Scheduling ProblemsOperations Research, 1965
- Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near OptimumJournal of the Operational Research Society, 1965
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954