Automated Planning of Underground Mining Operations with Regard to Geological and Geotechnical Constraints
- 1 June 2023
- journal article
- research article
- Published by Pleiades Publishing Ltd in Journal of Mining Science
- Vol. 59 (3) , 490-496
Abstract
The authors present a multi-factor algorithm for making provisions for geological/geotechnical constraints and operation timing criteria subject to availability of resources. The algorithm enables embracing a variety of possible combinations of heading or stoping conditions at each specific underground mine facility. The algorithm is a part of the digital tool of automated underground mine production planning in geological and mining information system MINEFRAME.Keywords
This publication has 9 references indexed in Scilit:
- Rock haulage loop design in automated underground mine planningMining informational and analytical bulletin, 2022
- Ore and Backfill Dilution in Underground Hard Rock MiningJournal of Mining Science, 2021
- Digital tools for underground mine planning: Cut-and-fill miningEurasian Mining, 2021
- Digital transformation of mining industry: Past, Present and FutureGornyi Zhurnal, 2020
- A simulation–optimization framework for short-term underground mine production schedulingOptimization and Engineering, 2020
- Improvement of methodical framework for autonomous scheduling of mining operations during underground mine design and planningMining informational and analytical bulletin, 2020
- Understanding plan’s priorities: Short term scheduling optimization2019
- Digital technologies for sustainable engineering in mining – The first step towards a “smart mine”Gornyi Zhurnal, 2018
- Stochastic optimization for strategic mine planning: A decade of developmentsJournal of Mining Science, 2011