Prestressed concrete piles are crucial foundation elements in large-scale infrastructure projects, where consistency of concrete quality, particularly slump and compressive strength, is critical. Despite having implemented ISO 9001:2015, PT Varia Usaha Beton faces product nonconformities, with 95.24% of issues related to compressive strength. Objective : To apply Statistical Process Control (SPC) at PT Varia Usaha Beton to evaluate process capability, identify root causes of nonconformities, and assess the impact of corrective measures on quality and production costs. Method : A case study using descriptive quantitative analysis employed the seven quality control tools, including histograms, control charts, cause-and-effect diagrams, and scatter plots. Results : A strong negative relationship between slump and compressive strength led to an adjustment of the slump interval from 10–14 cm to 12–16 cm. Modifying the water–cement ratio from 0.36 to 0.38 increased the process capability index for the lower specification limit (Cpl) from 1.77 to 2.03, although some subgroups remained outside the control limits. Production costs increased by Rp 2,805/m (2.07%). Implications : Continued process monitoring is required to support control of the water–cement ratio and slump; the relatively minor cost increase provides an economic basis for quality improvement. Originality : The study integrates process capability analysis and production cost evaluation for prestressed concrete piles in a single industrial case study.