Construction Project Evaluation Using CPM-Crashing, CPM-PERT and CCPM for Minimize Project Delays
Open Access
- 1 June 2021
- conference paper
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1933 (1) , 012096
Abstract
This research conducted in one construction company in Indonesia, the company was facing several problems, many projects that already ended have delays. Overdue payment one of the projects can reach Rp 252.544.148.-. For calculating late payment that the company can save researcher using Critical Path Method (CPM)-Crashing. CPM-Crashing method can accelerate project duration by increase resource budget, so company doesn’t need to pay overdue payment. The result of CPM-Crashing is company can save Rp. 227.584.147.-late payment. To anticipate project delay proper planning is required. One of project planning method is project scheduling. Great loss because of the overdue amount, the company must evaluate their project schedule. The Researcher using CPM-Project Evaluation Review Technic (PERT) and Critical Chain Project Management (CCPM) both methods can give new project schedule. CPM-PERT can give probability project finish and CCPM can give new project schedule. The result of this research is probability project is not delay is very low that is only 55% project can finish on time, the company must try CCPM schedule.Keywords
This publication has 7 references indexed in Scilit:
- Decision support system for truck scheduling in logistic network through cross-docking strategyJournal of Physics: Conference Series, 2021
- Optimizing rice distribution routes in Indonesia using a two-step linear programming considering logistics costsJournal of Physics: Conference Series, 2021
- Setting the natural gas selling price through pipeline network optimization and project feasibility studyJournal of Physics: Conference Series, 2021
- Quality Control of Frame Production Using DMAIC Method in Plastic PP Corrugated Box ManufacturerJournal of Physics: Conference Series, 2021
- Project scheduling for constructing biogas plant using critical path methodRenewable and Sustainable Energy Reviews, 2018
- Critical Chain Project Management Improves Project PerformanceProject Management Journal, 1999
- Project management with time, cost, and quality considerationsEuropean Journal of Operational Research, 1996