Understanding the requirements for project management maturity models: Awareness of the ICT industry in Malaysia
- 1 December 2010
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 34 (21573611) , 1573-1577
Abstract
Surveys reveal that the higher the organization project management maturity level is, the greater it enhances project performance. However it is vital to first understand the requirements of such a maturity model in the context of the target industry or sector. In this study, we aim to assess the current status of project management maturity model (PMMM) adoption in Malaysia's ICT industry as an initiative to conceptualize a model for use in the sector. An online survey was carried out to investigate the level of PMMM awareness, its extent of adoption or practices and its prerequisite requirements for use in the ICT industry. Based on our findings, a preliminary framework of the PMMM is proposed in our next phase of study.Keywords
This publication has 8 references indexed in Scilit:
- Survey response rate levels and trends in organizational researchHuman Relations, 2008
- An analysis of software process improvement for sustainable development in Thailand2008
- Systematic review of organizational motivations for adopting CMM-based SPIInformation and Software Technology, 2008
- A Survey of CMM/CMMI Implementation in ChinaLecture Notes in Computer Science, 2006
- Project Management Maturity: An Industry BenchmarkProject Management Journal, 2003
- Project Management Process Maturity (PM)2 ModelJournal of Management in Engineering, 2002
- A Meta-Analysis of Response Rates in Web- or Internet-Based SurveysEducational and Psychological Measurement, 2000
- Assessing Project Management MaturityProject Management Journal, 2000