Effective Constructive Heuristic and Metaheuristic for the Distributed Assembly Blocking Flow-shop Scheduling Problem
- 30 July 2020
- journal article
- research article
- Published by Springer Nature in Applied Intelligence
- Vol. 50 (12) , 4647-4669
Abstract
No abstract availableKeywords
Funding Information
- Natural Science Foundation of the Jiangsu Higher Education Institutions of China (19KJB520042)
- Research Startup Fund of Shaanxi Normal University (1110011056)
- Fundamental Research Funds for the Central Universities (GK202003073)
- Natural Science Basic Research Program of Shaanxi (2020JQ-425)
This publication has 44 references indexed in Scilit:
- An effective iterated greedy algorithm for the mixed no-idle permutation flowshop scheduling problemOmega, 2014
- Overview of Scheduling Methods2014
- The Distributed Assembly Permutation Flowshop Scheduling ProblemInternational Journal of Production Research, 2013
- Effective heuristics for the blocking flowshop scheduling problem with makespan minimizationOmega, 2012
- The distributed permutation flowshop scheduling problemComputers & Operations Research, 2010
- A novel hybrid discrete differential evolution algorithm for blocking flow shop scheduling problemsComputers & Operations Research, 2010
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problemEuropean Journal of Operational Research, 2007
- A note on constructive heuristics for the flowshop problem with blockingInternational Journal of Production Economics, 2004
- An efficient constructive heuristic for flowtime minimisation in permutation flow shopsOmega, 2003
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983