Comparing three scheduling methods using BIM models in the Last Planner System
Open Access
- 20 December 2017
- journal article
- research article
- Published by Walter de Gruyter GmbH in Organization, Technology and Management in Construction: an International Journal
- Vol. 9 (1) , 1604-1614
Abstract
This article presents strategies for teaching scheduling methods such as takt-time, flowlines, and point-to-point precedence relations (PTPPRs) using building information modeling (BIM) models in the Last Planner System. This article is the extended version of the article entitled “TeachingTakt-Time, Flowline and Point-to-point Precedence Relations: A Peruvian Case Study,” which has been published inProcedia Engineering(Vol. 196, 2017, pages 666–673). A case study is conducted in final year students of civil engineering at the Pontifical Catholic University of Peru. The mock-up project is an educational building that has high repetitive processes in the structural works phase. First, traditional tools such as Excel spreadsheets and 2D drawings were used to teach production system design with takt-time, flowlines, and PTPPR. Second, 3D and 4D models with Revit 2016 and Navisworks 2016 were used to integrate the previous schedules with a BIM model and to identify its strengths and weaknesses. Finally, Vico Office was used for the automation of schedules and comparison of the methods in 4D and 5D. This article describes the lectures, workshops, and simulations employed, as well as the feedback from students and researchers. The success of the teaching strategy is reflected in the survey responses from students and the final perceptions of the construction management tools presented.Keywords
This publication has 8 references indexed in Scilit:
- PDM Time Analysis with Continuous and Point-to-Point Relations: Calculations Using an Artificial ExampleProcedia Engineering, 2016
- Comparing Point-to-point Precedence Relations and Location-based Management System in Last Planner System: A Housing Project of Highly Repetitive Processes Case StudyProcedia Engineering, 2016
- Teaching Lean Construction: Pontifical Catholic University of Peru Training Course in Lean Project & Construction ManagementProcedia Engineering, 2015
- Integrating ISO 21500 Guidance on Project Management, Lean Construction and PMBOKProcedia Engineering, 2015
- Point-to-point Versus Traditional Precedence Relations for Modeling Activity OverlappingProcedia Engineering, 2015
- Investigation of Critical Activities in a Network with Point-to-point RelationsProcedia Engineering, 2015
- Linear projects scheduling using spreadsheets featuresAlexandria Engineering Journal, 2011
- The Combination of Last Planner System and Location-Based Management SystemLean Construction Journal, 2010