Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
Authors:
- S. ThiagarajanSTS. Thiagarajan
- Chandrasekharan RajendranCRChandrasekharan Rajendran
- 1 December 2005
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 49 (4) , 463-503
Abstract
No abstract availableKeywords
This publication has 38 references indexed in Scilit:
- Input control and dispatching rules in a dynamic CONWIP flow-shopInternational Journal of Production Research, 2000
- Sequencing with Earliness and Tardiness Penalties: A ReviewOperations Research, 1990
- The effects of product structure and sequencing rule on assembly shop performanceInternational Journal of Production Research, 1989
- A survey of priority rule-based schedulingOR Spectrum, 1989
- Priority Assignment Procedures in Multi-Level Assembly Job ShopsIIE Transactions, 1987
- OPERATING POLICIES FOR SCHEDULING ASSEMBLED PRODUCTSDecision Sciences, 1982
- A state-of-the-art survey of dispatching rules for manufacturing job shop operationsInternational Journal of Production Research, 1982
- The development and evaluation of a cost‐based composite scheduling ruleNaval Research Logistics Quarterly, 1974
- Review of sequencing researchNaval Research Logistics Quarterly, 1970
- Simulation of a Simplified Job ShopManagement Science, 1960