A note on the single machine CON and CONW problems with lot scheduling
- 1 March 2021
- journal article
- research article
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 42 (2) , 327-338
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Minmax scheduling problems with common due-date and completion time penaltyJournal of Combinatorial Optimization, 2018
- Single-machine common due date total earliness/tardiness scheduling with machine unavailabilityJournal of Scheduling, 2018
- Minmax common due-window assignment and scheduling on a single machine with two competing agentsJournal of the Operational Research Society, 2018
- Common due date assignment with generalized earliness/tardiness penaltiesComputers & Industrial Engineering, 2017
- A two-agent single machine scheduling problem with due-window assignment and a common flow-allowanceJournal of Combinatorial Optimization, 2016
- A survey on scheduling problems with due windowsEuropean Journal of Operational Research, 2015
- Lot scheduling on a single machineInformation Processing Letters, 2014
- A survey of the state-of-the-art of common due date assignment and scheduling researchEuropean Journal of Operational Research, 2002
- Common due window size and location determination in a single machine scheduling problemJournal of the Operational Research Society, 1998
- Determination of common due window location in a single machine scheduling problemEuropean Journal of Operational Research, 1996