Continuous process improvement implementation framework using multi-objective genetic algorithms and discrete event simulation
- 20 September 2018
- journal article
- research article
- Published by Emerald Publishing in Business Process Management Journal
- Vol. 25 (5) , 1020-1039
Abstract
Purpose: Continuous process improvement is a hard problem, especially in high variety/low volume environments due to the complex interrelationships between processes. The purpose of this paper is to address the process improvement issues by simultaneously investigating the job sequencing and buffer size optimization problems. Design/methodology/approach: This paper proposes a continuous process improvement implementation framework using a modified genetic algorithm (GA) and discrete event simulation to achieve multi-objective optimization. The proposed combinatorial optimization module combines the problem of job sequencing and buffer size optimization under a generic process improvement framework, where lead time and total inventory holding cost are used as two combinatorial optimization objectives. The proposed approach uses the discrete event simulation to mimic the manufacturing environment, the constraints imposed by the real environment and the different levels of variability associated with the resources. Findings: Compared to existing evolutionary algorithm-based methods, the proposed framework considers the interrelationship between succeeding and preceding processes and the variability induced by both job sequence and buffer size problems on each other. A computational analysis shows significant improvement by applying the proposed framework. Originality/value: Significant body of work exists in the area of continuous process improvement, discrete event simulation and GAs, a little work has been found where GAs and discrete event simulation are used together to implement continuous process improvement as an iterative approach. Also, a modified GA simultaneously addresses the job sequencing and buffer size optimization problems by considering the interrelationships and the effect of variability due to both on each other.Keywords
This publication has 23 references indexed in Scilit:
- Two-stage hybrid flow shop scheduling with dynamic job arrivalsComputers & Operations Research, 2012
- Optimization tool for short-term production planning and schedulingInternational Journal of Production Economics, 2008
- Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation methodRobotics and Computer-Integrated Manufacturing, 2007
- Utilizing buffer management to improve performance in a healthcare environmentEuropean Journal of Operational Research, 2006
- Multi-objective optimization using genetic algorithms: A tutorialReliability Engineering & System Safety, 2006
- Genetic algorithms to minimize the weighted number of late jobs on a single machineEuropean Journal of Operational Research, 2003
- A knowledge-based evolutionary strategy for scheduling problems with bottlenecksEuropean Journal of Operational Research, 2003
- Improving a practical DBR buffering approach using Workload ControlInternational Journal of Production Research, 2003
- The use of genetic algorithms to solve the economic lot size scheduling problemEuropean Journal of Operational Research, 1998
- Evolution based learning in a job shop scheduling environmentComputers & Operations Research, 1995