Two-machine flowshop scheduling with availability constraints
Author:
- Chung-Yee LeeCLChung-Yee Lee
- 1 April 1999
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 114 (2) , 420-429
Abstract
No abstract availableThis publication has 16 references indexed in Scilit:
- Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraintOperations Research Letters, 1997
- Machine scheduling with an availability constraintJournal of Global Optimization, 1996
- A Polynomial Approximation Scheme for a Constrained Flow-Shop Scheduling ProblemMathematics of Operations Research, 1994
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling ProblemManagement Science, 1993
- Single machine flow-time scheduling with scheduled maintenanceActa Informatica, 1992
- The Lessons of Flowshop Scheduling ResearchOperations Research, 1992
- Parallel machines scheduling with nonsimultaneous machine available timeDiscrete Applied Mathematics, 1991
- Single machine flow-time scheduling with a single breakdownActa Informatica, 1989
- The Complexity of Flowshop and Jobshop SchedulingMathematics of Operations Research, 1976
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954