Flowshop/no-idle scheduling to minimise the mean flowtime
Authors:
- 1 October 2005
- journal article
- research article
- Published by Cambridge University Press (CUP) in The ANZIAM Journal
- Vol. 47 (2) , 265-275
Abstract
This paper deals with n-job, 2-machine flowshop/mean flowtime scheduling problems working under a “no-idle” constraint, that is, when machines work continuously without idle intervals. A branch and bound technique has been developed to solve the problem.Keywords
This publication has 12 references indexed in Scilit:
- Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover timesJournal of the Operational Research Society, 2001
- No‐wait and separate setup three‐machine flowshop with total completion time criterionInternational Transactions in Operational Research, 2000
- Total flowtime in no-wait flowshops with separated setup timesComputers & Operations Research, 1998
- Genetic algorithms applied to the continuous flow shop problemComputers & Industrial Engineering, 1996
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in ProcessOperations Research, 1996
- Solvable Cases of the No-wait Flow-shop Scheduling ProblemJournal of the Operational Research Society, 1991
- Flowshop/no-idle or no-wait scheduling to minimize the sum of completion timesNaval Research Logistics Quarterly, 1982
- The Complexity of Flowshop and Jobshop SchedulingMathematics of Operations Research, 1976
- Application of the Branch and Bound Technique to Some Flow-Shop Scheduling ProblemsOperations Research, 1965
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954