Abstract
Biomass co‐firing with coal is a near‐term option to displace fossil fuels and can facilitate the development of biomass conversion and the build‐out of biomass supply infrastructure. A GIS‐based modeling framework (EU‐28, Norway, and Switzerland) is used to quantify and localize biomass demand for co‐firing in coal power plants and agricultural and forest residue supply potentials; supply and demand are then matched based on minimizing the total biomass transport costs (field to gate). Key datasets (e.g., land cover, land use, and wood production) are available at 1,000 m or higher resolution, while some data (e.g., simulated yields) and assumptions (e.g., crop harvest index) have lower resolution and were resampled to allow modeling at 1,000 m resolution. Biomass demand for co‐firing is estimated at 184 PJ in 2020, corresponding to an emission reduction of 18 Mt CO2. In all countries except Italy and Spain, the sum of the forest and agricultural residues available at less than 300 km from a co‐firing plant exceeds the assessed biomass demand. The total cost of transporting residues to these plants is reduced if agricultural residues can be used, as transport distances are shorter. The total volume of forest residues less than 300 km from a co‐firing plant corresponds to about half of the assessed biomass demand. Almost 70% of the total biomass demand for co‐firing is found in Germany and Poland. The volumes of domestic forest residues in Germany (Poland) available within the cost range 2–5 (1.5–3.5) €/GJ biomass correspond to about 30% (70%) of the biomass demand. The volumes of domestic forest and agricultural residues in Germany (Poland) within the cost range 2–4 (below 2) €/GJ biomass exceed the biomass demand for co‐firing. Half of the biomass demand is located within 50 km from ports, indicating that long‐distance biomass transport by sea is in many instances an option.Keywords
Funding Information
- Vattenfall (G-2005/12)
This publication has 59 references indexed in Scilit:
- Bioenergy from “surplus” land: environmental and socio-economic implicationsBioRisk, 2012
- Guidelines for harvesting forest biomass for energy: A synthesis of environmental considerationsBiomass and Bioenergy, 2011
- Biomass resources and costs: Assessment in different EU countriesBiomass and Bioenergy, 2011
- The realisable potential supply of woody biomass from forests in the European UnionForest Ecology and Management, 2011
- Assessment of the availability of agricultural crop residues in the European Union: Potential and limitations for bioenergy useWaste Management, 2010
- Strategies for 2nd generation biofuels in EU – Co-firing to stimulate feedstock supply development and process integration to improve energy efficiency and economic competitivenessBiomass and Bioenergy, 2010
- Comparative analysis of wood chips and bundles – Costs, carbon dioxide emissions, dry-matter losses and allergic reactionsBiomass and Bioenergy, 2010
- Co-firing biomass with coal for electricity generation—An assessment of the potential in EU27Energy Policy, 2009
- Bioenergy expansion in the EU: Cost-effective climate change mitigation, employment creation and reduced dependency on imported fuelsEnergy Policy, 2007
- The European power plant infrastructure—Presentation of the Chalmers energy infrastructure database with applicationsEnergy Policy, 2007