How Design Consultants Perceive Potential Causes of Variation Orders for Institutional Buildings in Singapore
- 1 January 2005
- journal article
- research article
- Published by Taylor & Francis in Architectural Engineering and Design Management
- Vol. 1 (3) , 181-196
Abstract
Variations are common in all types of construction projects. The construction process is influenced by highly changing variables and unpredictable factors that can arise from different sources. The study identifies the causes of variations in institutional building projects in Singapore. To achieve the study objectives, a questionnaire survey was carried out to collect information on potential causes of variations. Through the literature review, the 53 causes of variation orders were identified. These provided the basis for the formulation of the questionnaire. Responses from 33 design consultants, who were involved in the institutional projects in Singapore, were analysed. The survey results suggest that a change in plans or scope by the owner, unforeseen problems, defective workmanship, change in specifications by the owner and safety considerations were the most important causes of variation orders for institutional buildings in Singapore. Recommendations were suggested based on the findings of the research and literature review. The involvement of professionals during the design and construction phases, clear and thorough project briefs, frequent communication among professionals, involvement of a project manager from an independent firm to manage the project and involvement of the owner during the design phase were suggested for controlling the most important causes of variation orders for institutional buildings in Singapore.Keywords
This publication has 11 references indexed in Scilit:
- Causes of Discrepancies between Design and ConstructionArchitectural Science Review, 2004
- Developing world class construction companies in SingaporeConstruction Management and Economics, 2001
- Project Change Management SystemJournal of Management in Engineering, 2001
- Coordination Issues in Chinese Large Building ProjectsJournal of Management in Engineering, 2000
- Collaborative Planning and Scheduling of Interrelated Design ChangesJournal of Architectural Engineering, 2000
- Claims for extensions of time in civil engineering projectsConstruction Management and Economics, 1998
- The Constructibility Review Process: A Constructor's PerspectiveJournal of Management in Engineering, 1997
- Factors influencing construction time and cost overruns on high-rise projects in IndonesiaConstruction Management and Economics, 1997
- Critical Success Factors for Construction ProjectsJournal of Construction Engineering and Management, 1992
- Design — Construction interface problems in Saudi ArabiaBuilding Research & Information, 1992