Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraints
- 1 October 2019
- journal article
- research article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 136, 614-634
Abstract
No abstract availableKeywords
This publication has 43 references indexed in Scilit:
- Genetic algorithms with different representation schemes for complex hybrid flexible flow line problemsInternational Journal of Metaheuristics, 2010
- A memetic algorithm for the job-shop with time-lagsComputers & Operations Research, 2008
- Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion timesInternational Journal of Production Economics, 2008
- Two-machine open shop scheduling with special transportation timesJournal of the Operational Research Society, 1999
- Time lag size in multiple operations flow shop scheduling heuristicsEuropean Journal of Operational Research, 1998
- Single machine scheduling with chain: structured precedence constraints and separation time windowsIEEE Transactions on Robotics and Automation, 1996
- Lot streaming in the two-machine flow shop with setup timesAnnals of Operations Research, 1995
- A two-machine flowshop sequencing problem with limited waiting time constraintsComputers & Industrial Engineering, 1995
- A genetic algorithm for flowshop sequencingComputers & Operations Research, 1995
- A Microcomputer Based Solution to a Practical Scheduling ProblemJournal of the Operational Research Society, 1985