Synchronization of production and delivery with time windows in fixed-position assembly islands under Graduation Intelligent Manufacturing System
Authors:
- Daqiang GuoDGDaqiang Guo
- Zhongyuan LyuZLZhongyuan Lyu
- Wei WuWWWei Wu
- Ray Y. ZhongRZRay Y. Zhong
- Yiming RongYRYiming Rong
- George Q. HuangGHGeorge Q. Huang
- 1 February 2022
- journal article
- research article
- Published by Elsevier in Robotics and Computer-Integrated Manufacturing
- Vol. 73
Abstract
No abstract availableKeywords
This publication has 52 references indexed in Scilit:
- Batch scheduling problem for a machinery factory with fixed-position layoutInternational Journal of Production Research, 2012
- The just-in-time scheduling problem in a flow-shop scheduling systemEuropean Journal of Operational Research, 2012
- From cloud computing to cloud manufacturingRobotics and Computer-Integrated Manufacturing, 2012
- Estimating order lead times in hybrid flowshops with different scheduling rulesComputers & Industrial Engineering, 2009
- Simulation-based scheduling of assembly operationsInternational Journal of Computer Integrated Manufacturing, 2009
- Optimal method for changing the number of kanbans in thee-Kanban system and its applicationsInternational Journal of Production Research, 2007
- Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facilityIEEE Transactions on Semiconductor Manufacturing, 1998
- Simulation analysis of just-in-time production systemsInternational Journal of Production Economics, 1995
- The role of automatic identification (Auto ID) in the computer integrated manufacturing (CIM) architectureComputers & Industrial Engineering, 1992
- Toyota production system and Kanban system Materialization of just-in-time and respect-for-human systemInternational Journal of Production Research, 1977