Abstract
Multi-Stage Transmission Network Expansion Planning (MS-TNEP) is critical for adapting power grids to long-term renewable integration. However, simultaneously incorporating N-1 security, active power losses, and spatial generation uncertainties imposes prohibitive computational complexity. This paper proposes a probabilistic MS-TNEP model evaluated over a 20-year horizon. To overcome intractability, a hybrid decomposition framework is employed, delegating discrete combinatorial investment decisions to an upper-level metaheuristic while resolving operational feasibility, power losses via fictitious nodal demand, and N-1 contingencies through lower-level linear programming. Furthermore, a novel Pack-Based Grey Wolf Optimizer (PBGWO) is introduced to enhance convergence in this constrained domain. The approach is validated on the modified Garver and the 46-bus Southern-Brazilian systems under multiple wind and conventional generation scenarios. Comparative analysis against the Genetic Algorithm, standard GWO, and Whale Optimization Algorithm reveals that PBGWO consistently identifies the optimal expansion schedules.

This publication has 21 references indexed in Scilit: