Understanding and Accommodating Risk and Uncertainty in Toll Road Projects
Authors:
- 1 January 2009
- journal article
- review article
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2132 (1) , 106-112
Abstract
Forecasting traffic and toll revenues for new highway projects involves great uncertainty because of the inherent uncertainty in the models used to make forecasts. As private investment becomes more common in project financing, quantifying the levels of risk and uncertainty associated with such projects becomes critical. This paper represents a review of many key studies and reports dealing with uncertainty in traffic and revenue forecasts for highway projects. These studies found that tolled projects tend to suffer from substantial optimism bias in forecasts, with predicted traffic volumes exceeding actual volumes by 30% or more about half the time. Moreover, projects with greater uncertainty tend to overestimate Year 1 traffic volumes more and stabilize at lower final traffic volumes. But after one controls for added optimism bias in traffic forecasts (compared with nontolled projects), there is little difference in uncertainty levels between tolled and nontolled forecasts. A typical way to address uncertainty in traffic forecasts is through sensitivity testing via variations in key inputs and parameters. A more extensive and less arbitrary version of this, Monte Carlo simulation, can provide probability distributions of future traffic and revenue, although it tends to require many simulations, demanding greater computational effort and time, unless networks are streamlined. Nonetheless, if reasonable assumptions for model input and parameter distributions can be made, Monte Carlo simulation generates a variety of useful information and establishes the actual likelihood of loss (rather than more basic win–lose indicators from a limited set of stress tests).Keywords
This publication has 12 references indexed in Scilit:
- Protecting the Public InterestTransportation Research Record: Journal of the Transportation Research Board, 2008
- Assessing uncertainty in urban simulations using Bayesian meldingTransportation Research Part B: Methodological, 2007
- Multivariate uncertainty analysis of an integrated land use and transportation model: MEPLANTransportation Research Part D: Transport and Environment, 2006
- RETRACTED: Inaccuracy in Traffic ForecastsTransport Reviews, 2006
- How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of TransportationJournal of the American Planning Association, 2005
- Propagation of Uncertainty in Transportation Land Use Models: Investigation of DRAM-EMPAL and UTPP Predictions in Austin, TexasTransportation Research Record: Journal of the Transportation Research Board, 2003
- Uncertain socioeconomic projections used in travel demand and emissions models: could plausible errors result in air quality nonconformity?Transportation Research Part A: Policy and Practice, 2002
- The propagation of uncertainty through travel demand models: An exploratory analysisThe Annals of Regional Science, 2002
- Uncertainty Propagation in an Integrated Land Use-Transportation Modeling Framework: Output Variation via UrbanSimTransportation Research Record: Journal of the Transportation Research Board, 2002
- Uncertainty in the context of highway appraisalTransportation, 1980