Implementation of a Petri-net based Digital Twin for the development procedure of an Electric Vehicle
Authors:
- 1 September 2020
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 862-867
Abstract
In the current work the development procedure (design, manufacture and assembly) of an electric vehicle is considered. Uncertainties make difficult to follow initial time plan, so monitoring of the development procedure is necessary. To handle delays a method using Petri nets to model the tasks of the development procedure and their dependencies is introduced. The model is not used offline as a passive element but is connected and interacts with the physical system (development procedure). Based on the information exchange between physical and digital system, alternative ways to overcome delays are studied and the optimal solution is calculated, tested and applied. Results are provided according to different scenarios, in order to show the efficiency and applicability of the proposed method.Keywords
This publication has 9 references indexed in Scilit:
- Enabling technologies and tools for digital twinJournal of Manufacturing Systems, 2021
- A Review of the Roles of Digital Twin in CPS-Based Production Systems2019
- Design of a SWOT Analysis Model and its Evaluation in Diverse Digital Business Ecosystem ContextsProcedia Computer Science, 2019
- Digital Twin in Industry: State-of-the-ArtIEEE Transactions on Industrial Informatics, 2018
- Modeling Task Dependencies in Project Management Using Petri Nets with Arc Extensions2018
- Digital Twin in manufacturing: A categorical literature review and classificationIFAC-PapersOnLine, 2018
- Life cycle, PESTLE and Multi-Criteria Decision Analysis of CCS process alternativesJournal of Cleaner Production, 2017
- Digital Twin—The Simulation Aspect2016
- Petri nets: Properties, analysis and applicationsProceedings of the IEEE, 1989