A multi-criteria master production scheduling approach for special purpose machinery
Authors:
- Christian GahmCGChristian Gahm
- Bastian DünnwaldBDBastian Dünnwald
- Ramin SahamieRSRamin Sahamie
- 1 March 2014
- journal article
- conference paper
- Published by Elsevier in International Journal of Production Economics
- Vol. 149, 89-101
Abstract
No abstract availableKeywords
This publication has 31 references indexed in Scilit:
- Setting a common due date in a constrained flowshop: A variable neighbourhood search approachComputers & Operations Research, 2010
- A simulated annealing hyperheuristic for construction resource levellingConstruction Management and Economics, 2010
- Variable neighbourhood search: methods and applicationsAnnals of Operations Research, 2009
- A variable neighbourhood search algorithm for the flexible job-shop scheduling problemInternational Journal of Production Research, 2009
- A hybrid heuristic for a multi-objective real-life car sequencing problem with painting and assembly line constraintsEuropean Journal of Operational Research, 2008
- A hierarchical approach to multi-project planning under uncertaintyOmega, 2007
- Solving the continuous flow-shop scheduling problem by metaheuristicsEuropean Journal of Operational Research, 2003
- Variable neighborhood search: Principles and applicationsEuropean Journal of Operational Research, 2001
- Optimal resource leveling of multi-resource projectsComputers & Industrial Engineering, 1996
- An outer-approximation method for multiperiod design optimizationIndustrial & Engineering Chemistry Research, 1992