Optimum buyer-vendor inventory model with coordination and price breaks
Open Access
- 1 March 2021
- conference paper
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1770 (1) , 012104
Abstract
This study develop optimum inventory model for buyer-vendor with coordination and price breaks situation. We develop the production inventory model with screening for deteriorating product and disposed for damaged items. The coordination strategy the buyer takes decision for the damaged products. Integrated inventory total cost is developed for system optimum values are found by using Lagrange’s multiplier technique. Various examples are given to illustrate the developed model.Keywords
This publication has 11 references indexed in Scilit:
- A production inventory model for vendor–buyer coordination with quantity discount, backordering and rework for fixed life time productsJournal of Industrial and Production Engineering, 2015
- An EOQ model for deteriorating items with inflation and time value of money considering time-dependent deteriorating rate and delay paymentsSystems Science & Control Engineering, 2015
- Mathematical model for optimum production inventory with deteriorating itemsApplied Mathematical Sciences, 2015
- An optimal inventory model for a deteriorating item with time - dependent quadratic demand and delay in payment for two warehousesInternational Journal on Information Sciences and Computing, 2014
- An economic lot sizing production model for deteriorating items under two level trade creditApplied Mathematical Sciences, 2014
- An inventory model with time dependent demand and shortages under trade credit policyEconomic Modelling, 2013
- Optimum Production Coordination Inventory Model without ShortagesInternational Journal on Information Sciences and Computing, 2013
- An inventory model with variable demand, component cost and selling price for deteriorating itemsEconomic Modelling, 2013
- An EOQ model with delay in payments and stock dependent demand in the presence of imperfect productionApplied Mathematics and Computation, 2012
- An EOQ model with delay in payments and time varying deterioration rateMathematical and Computer Modelling, 2012