The cycle of instability: stress release and fissure flow as controls on gully head retreat
Author:
- 1 January 2001
- journal article
- research article
- Published by Wiley in Hydrological Processes
- Vol. 15 (1) , 3-12
Abstract
Gully head and wall retreat has commonly been attributed to fluvial scour and head collapse as a result of soil saturation, sapping or piping. The empirical evidence to substantiate these conceptual models is sparse, however, and often contradictory. This paper explores the hydrological and mechanical controls on gully head and wall stability by modelling the hydrology, stability and elastic deformation of a marl gully complex in Granada Province, south‐east Spain. The hydrological and slope‐stability simulations show that saturated conditions can be reached only where preferential fissure flow channels water from tension cracks into the base of the gully head, and that vertical or subvertical heads will be stable unless saturation is achieved. Owing to the high unsaturated strengths of marl measured in this research, failure in unsaturated conditions is possible only where the gully head wall is significantly undercut. Head retreat thus requires the formation of either a tension crack or an undercut hollow. Finite‐element stress analysis of eroding slopes reveals a build up of shear stress at the gully head base, and a second stress anomaly just upslope of the head wall. Although tension cracks on gully heads have often been attributed to slope unloading, this research provides strong evidence that the so called ‘sapping hollow’ commonly found in the gully headwall base is also a function of stress release. Although further research is needed, it seems possible that ‘pop out’ failures in river channels may be caused by the same process. The hydrological analysis shows that, once a tension crack has developed, throughflow velocity in the gully headwall will increase by an order of magnitude, promoting piping and enlargement of this weakened area. It is, therefore, possible to envisage a cycle of gully expansion in which erosion, channel incision or human action unloads the slope below a gully head, leading to stress patterns that account for the tension crack and a stress‐release hollow. The tension crack promotes faster throughflow, encouraging hollow enlargement and piping, which undercut the gully head. The tension crack permits the development of positive pore‐water pressures behind the gully head, leading either to failure or contributing to toppling. Finally the debris may be eroded by fluvial action, unloading a new section of slope and completing the cycle of gully head retreat. Copyright © 2001 John Wiley & Sons, Ltd.Keywords
This publication has 9 references indexed in Scilit:
- Process-form interactions in unstable sand-bed river channels: A numerical modeling approachGeomorphology, 1997
- Modelling the role of climate, vegetation and pedogenesis in shallow translational hillslope failureEarth Surface Processes and Landforms, 1995
- Subsurface hydrology of layered colluvium mantles in unchannelled valleys—south‐Eastern BrazilEarth Surface Processes and Landforms, 1994
- USING A COMBINED SLOPE HYDROLOGY-STABILITY MODEL TO DEVELOP CUT SLOPE DESIGN CHARTS.Proceedings of the Institution of Civil Engineers, 1991
- Gully erosion: processes and modelsProgress in Physical Geography: Earth and Environment, 1991
- Towards an improved specification of slope hydrology in the analysis of slope instability problems in the tropicsProgress in Physical Geography: Earth and Environment, 1991
- The shear strength of unsaturated soilsCanadian Geotechnical Journal, 1978
- Failure Sequence of Gully Headwalls in Western IowaSoil Science Society of America Journal, 1978
- CAPILLARY CONDUCTION OF LIQUIDS THROUGH POROUS MEDIUMSJournal of Applied Physics, 1931