Abstract
With the considerable increase of Distributed Energy Resources (DER), the reliable and cost-effective operation of the electricity distribution grid becomes challenging. This relies on computationally dependable and tractable optimisation solvers, which may handle: 1) non-linear AC power flow constraints, and 2) the multiple numbers of input variables and objectives of DER, over the operational horizon. In this paper, we introduce an application of a high-performance MultiPeriod AC Optimal Power Flow (MPOPF) solver, called "BATTPOWER", to simulate active distribution grids for a near-future scenario. A large-scale Norwegian distribution grid along with a large population of Electric Vehicles (EV) are here taken as the case-study. We suggest and analyse three operational strategies for the Distribution System Operator (DSO): (a) uncoordinated (dumb) charging, (b) coordinated charging with the objective of energy cost-minimisation, and (c) coordinated charging with the objective of energy cost-minimisation along with operational constraints of the grid. The results demonstrate that the uncoordinated charging would lead to: 1) overloading of lines and transformers when the share of EVs are above 20\%, and 2) higher operational costs than the proposed control strategies of (b) and (c). Although the implementation of strategy (b) is not difficult to apply, nonetheless operational line/transformer limits are violated when the populations of EVs are growing above 36\%. This implies that current market design must be altered to allow active control of a large proportion of DERs within grid operational limits to achieve cost minimization at system level.