Diffusion Mechanism of Variable-Rate Grouting in Water Prevention and Control of Coal Mine
Open Access
Abstract
Regional grouting treatment is an effective technical means to prevent mine water disasters, and the grouting effect is affected by many factors. In actual grouting engineering, the single constant-rate grouting method is often transformed into a variable-parameter grouting process. However, research on grouting rates has been insufficient. This investigation focused on the issue of “the diffusion law of variable-rate grouting slurry in regional governance”. Methods such as theoretical analysis, numerical simulation, and field verification were used to evaluate the diffusion mechanism of variable-rate fracture grouting. The results indicated that the key parameters of variable-rate grouting, such as slurry diffusion distance and grouting pressure, were affected by the grouting rate. The decrease in the grouting rate reduced the migration speed of the slurry and the grouting pressure. The time for constant-velocity grouting and variable-velocity grouting to reach the same diffusion distance was 60 s and 108 s, respectively, which can be achieved with lower grouting pressure. When the grouting rate was 7.5 L/min and 30 L/min, the maximum grout diffusion distance was 2.81 m and 5.64 m, respectively, which required greater grouting pressure. The slurry diffusion rate decreased with the reduction in the grouting rate. Under the same diffusion distance conditions, variable-rate grouting took longer than constant high-rate grouting. In variable-rate grouting, the grouting pressure decreased stepwise with the grouting rate, with a final pressure drop of 77.4%. In grouting practice, the innovative use of the rate-reducing grouting method can greatly reduce the final grouting pressure under the premise of changing the slurry diffusion distance less, which can not only ensure the stability of surrounding rock but also reduce the cost of high-pressure grouting and the risk of grouting operation. The investigation results can provide scientific guidance for ground grouting renovation projects in deep coal mine water hazard areas.Keywords
Funding Information
- Postdoctoral Fellowship Program of CPSF (GZC20233005, 52274243, 2024QN11025)
- General program of the National Natural Science Foundation of China (GZC20233005, 52274243, 2024QN11025)
- Fundamental Research Funds for the Central Universities (GZC20233005, 52274243, 2024QN11025)
This publication has 15 references indexed in Scilit:
- Research on the diffusion plugging mechanism of flowing water grouting slurry in karst pipelinesScientific Reports, 2024
- Grouting mechanism of quick-setting slurry in fracture with random fracture opening considering time–space characteristics of viscosityActa Geotechnica, 2024
- Research on optimization of grouting treatment for underground mining goaf collapse based on 3-dimensional simulationFrontiers in Earth Science, 2024
- Sediment Instability Caused by Gas Production from Hydrate-bearing Sediment in Northern South China Sea by Horizontal Wellbore: Evolution and MechanismNatural Resources Research, 2023
- Surface Pre-Grouting Borehole Arrangement and Division of the Broken Roof of the Lower Seam of a Bifurcated Coal SeamEnergy Exploration & Exploitation, 2022
- Precise application of grouting technology in underground coal mining: water inrush risk of floor eliminationEnvironmental Science and Pollution Research, 2022
- Criterion of Grouting Pressure in Regional Advance Grouting Treatment to Prevent Water Disaster from Karst Aquifers in Coal Seam FloorsACS Omega, 2022
- Application and Evaluation of Regional Control Technology of Limestone Water Hazard: A Case Study of the Gubei Coal Mine, North ChinaGeofluids, 2021
- Mercury stable isotope compositions in magmatic-affected coal deposits: New insights to mercury sources, migration and enrichmentChemical Geology, 2018
- A new strength criterion and constitutive model of gas hydrate-bearing sediments under high confining pressuresJournal of Petroleum Science and Engineering, 2013