Abstract
Energy system models increasingly represent hydrogen production, storage, and demand, but they often rely on strong assumptions about hydrogen-related flexibility that may not hold under alternative infrastructure assumptions and constraints on hydrogen demand and production. This paper assesses the relation between anticipated physical infrastructure and the validity of simplified representations of hydrogen flexibility in long-term, sector-coupled planning models. Using POMMES-EU, we solve a single-horizon optimisation for 2050 with full-year hourly chronology across 27 European countries, and compare three hydrogen infrastructure pathways: no cross-border hydrogen pipelines, a pan-European hydrogen backbone, and a backbone with international hydrogen imports. Across these pathways, we vary the flexibility in industrial hydrogen offtake requirements and hydrogen production operating constraints. Allowing industrial demand to shift within the day reduces total system costs only marginally and the benefit declines with interconnection (0.56% without cross-border pipelines, below 0.2\% with a backbone and with imports). By contrast, a must-run constraint of 10\% of the nominal capacity for electrolysers increases total system costs by 0.62–0.94% across configurations. Limits on the hydrogen pipeline transport ramping rate affected total system costs by less than 0.07%. This indicates that---when simplifications are unavoidable---pipeline flexibility can be neglected, overestimating industrial demand flexibility is less likely to bias long-term planning outcomes compared to assuming perfectly flexible hydrogen production. Accounting for production inflexibilities remains a priority even when alternative flexibility sources, such as a strong network infrastructure, are available.

This publication has 22 references indexed in Scilit: