Approximate Deadline-Scheduling with Precedence Constraints
Preprint
Abstract
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence constraints. The goal is to compute a feasible schedule that minimizes the sum of penalties of late jobs. Lenstra and Rinnoy Kan [Annals of Disc. Math., 1977] in their seminal work introduced this problem and showed that it is strongly NP-hard, even when all processing times and weights are 1. We study the approximability of the problem and our main result is an O(log k)-approximation algorithm for instances with k distinct job deadlines.Keywords
All Related Versions
This publication has 10 references indexed in Scilit:
- Approximation algorithms for covering/packing integer programsJournal of Computer and System Sciences, 2005
- Single-Machine Scheduling with Precedence ConstraintsMathematics of Operations Research, 2005
- Approximating covering integer programs with multiplicity constraintsDiscrete Applied Mathematics, 2003
- Scheduling to Minimize Average Completion Time: Off-Line and On-Line Approximation AlgorithmsMathematics of Operations Research, 1997
- Fast approximation algorithm for job sequencing with deadlinesDiscrete Applied Mathematics, 1981
- The ellipsoid method and its consequences in combinatorial optimizationCombinatorica, 1981
- Complexity results for scheduling chains on a single machineEuropean Journal of Operational Research, 1980
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Approximation Algorithms for Certain Scheduling ProblemsMathematics of Operations Research, 1978
- Facets of the knapsack polytopeMathematical Programming, 1975