An analytical solution for a jointed shield‐driven tunnel lining
Authors:
- 7 February 2001
- journal article
- research article
- Published by Wiley in International Journal for Numerical and Analytical Methods in Geomechanics
- Vol. 25 (4) , 365-390
Abstract
This paper presents an analytical solution for the prediction of internal forces and displacements of a jointed segmental precast circular tunnel lining. The effects of joint stiffness on the performance of the tunnel lining are discussed. The ‘force method’ is used to determine the internal forces and displacements of jointed tunnel lining. Five shield‐driven tunnel cases are adopted to study the effects of joint stiffness, soil resistance, joint distribution and joint number on the internal forces and displacements of circular tunnels. Laboratory model tests are conducted to verify the proposed analytical solution. Copyright © 2001 John Wiley & Sons, Ltd.Keywords
This publication has 5 references indexed in Scilit:
- Ground Response to the Construction of Shanghai Metro Tunnel-Line 2Soils and Foundations, 1999
- Subsidence owing to tunnelling. I. Estimating the gap parameterCanadian Geotechnical Journal, 1992
- An analysis of three-dimensional ground movements: the Thunder Bay tunnelCanadian Geotechnical Journal, 1991
- The circular tunnel in elastic groundGéotechnique, 1975
- A Contribution to the Analysis of Stress in a Circular TunnelGéotechnique, 1961