Zhangbei demonstration project is a typical case of large-scale renewable energy sending out through VSC-HVDC. It provides a feasible way for the transmission and utilization of renewable energy in Zhangbei area. Considering the large number of power electronic equipment in renewable energy power plants and VSC-HVDC systems, the potential risks of various types of oscillations exist. Previous studies have mostly focused on the renewable energy side. The research on the dynamic stability characteristics of large-scale power grid at the receiving end is relatively few. According to the operation data of North China Power Grid in 2021, a detailed EMT real-time simulation model of Zhangbei flexible DC transmission grid is built based on HYPERSIM, including renewable energy base, Zhangbei flexible DC transmission project and large-scale AC power grid. Taking the super parallel computer as the core equipment, the actual control and protection devices same as the project site is connected to the proposed model. Detailed simulation is carried out, for the faults near the renewable energy base, VSC-HVDC grid and AC power grid respectively. The AC / DC response in the process of fault and recovery is studied. Especially, a safety and stability control measure is taken for some AC side faults with poor recovery characteristics to ensure the safety and stability of the receiving power grid. The simulation results provided technical support for the commissioning test during operation.