Lot streaming in three-stage production processes
Authors:
- C.A. GlassCGC.A. Glass
- J.N.D. GuptaJGJ.N.D. Gupta
- C.N. PottsCPC.N. Potts
- 1 June 1994
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 75 (2) , 378-394
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- Two- and three-machine flow shop scheduling problems with equal sized transfer batchesInternational Journal of Production Research, 1992
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and ComplexityJournal of the Operational Research Society, 1992
- Optimal and Heuristic Models for Lot Splitting in a Flow ShopDecision Sciences, 1990
- Solution Procedures for the Lot‐Streaming ProblemDecision Sciences, 1990
- Flow shop scheduling with lot streamingOperations Research Letters, 1989
- REPETITIVE LOTS: FLOW‐TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZINGDecision Sciences, 1988
- Production scheduling with capacity‐constrained transportation activitiesJournal of Operations Management, 1986
- Open Shop Scheduling to Minimize Finish TimeJournal of the ACM, 1976
- M-stage scheduling problem—a critical appraisalInternational Journal of Production Research, 1971
- A System for Managing Job-Shop ProductionThe Journal of Business, 1966