Optimization of Construction Duration and Schedule Robustness Based on Hybrid Grey Wolf Optimizer with Sine Cosine Algorithm
Open Access
Abstract
Construction duration and schedule robustness are of great importance to ensure efficient construction. However, the current literature has neglected the importance of schedule robustness. Relatively little attention has been paid to schedule robustness via deviation of an activity’s starting time, which does not consider schedule robustness via structural deviation caused by the logical relationships among activities. This leads to a possibility of deviation between the planned schedule and the actual situation. Thus, an optimization model of construction duration and schedule robustness is proposed to solve this problem. Firstly, duration and two robustness criteria including starting time deviation and structural deviation were selected as the optimization objectives. Secondly, critical chain method and starting time criticality (STC) method were adopted to allocate buffers to the schedule in order to generate alternative schedules for optimization. Thirdly, hybrid grey wolf optimizer with sine cosine algorithm (HGWOSCA) was proposed to solve the optimization model. The movement directions and speed of grey wolf optimizer (GWO) was improved by sine cosine algorithm (SCA) so that the algorithm’s performance of convergence, diversity, accuracy, and distribution improved. Finally, an underground power station in China was used for a case study, by which the applicability and advantages of the proposed model were proved.Keywords
Funding Information
- National Natural Science Foundation of China (51679165, 51839007)
- The Yalong River Joint Funds of the National Natural Science Foundation of China (U1765205)
This publication has 52 references indexed in Scilit:
- Incorporation of activity sensitivity measures into buffer management to manage project schedule riskEuropean Journal of Operational Research, 2016
- An uncertain model for RCPSP with solution robustness focusing on logistics project scheduleInternational Journal of e-Navigation and Maritime Economy, 2015
- Robustness analysis of underground powerhouse construction simulation based on Markov Chain Monte Carlo methodScience China Technological Sciences, 2015
- A methodology based on profitability criteria for defining the partial defection of customers in non-contractual settingsEuropean Journal of Operational Research, 2014
- Grey Wolf OptimizerAdvances in Engineering Software, 2014
- Time slack-based techniques for robust project scheduling subject to resource uncertaintyAnnals of Operations Research, 2010
- A tabu search procedure for developing robust predictive project schedulesInternational Journal of Production Economics, 2008
- A note on the paper by M. A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project schedulingInternational Journal of Production Economics, 2007
- Heuristic procedures for reactive project schedulingComputers & Industrial Engineering, 2007
- PSPLIB - A project scheduling problem libraryEuropean Journal of Operational Research, 1997