Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model
Top Cited Papers
Open Access
- 18 February 2020
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 12 (4) , 1514
Abstract
Project delays are the major problems tackled by the construction sector owing to the associated complexity and uncertainty in the construction activities. Artificial Intelligence (AI) models have evidenced their capacity to solve dynamic, uncertain and complex tasks. The aim of this current study is to develop a hybrid artificial intelligence model called integrative Random Forest classifier with Genetic Algorithm optimization (RF-GA) for delay problem prediction. At first, related sources and factors of delay problems are identified. A questionnaire is adopted to quantify the impact of delay sources on project performance. The developed hybrid model is trained using the collected data of the previous construction projects. The proposed RF-GA is validated against the classical version of an RF model using statistical performance measure indices. The achieved results of the developed hybrid RF-GA model revealed a good resultant performance in terms of accuracy, kappa and classification error. Based on the measured accuracy, kappa and classification error, RF-GA attained 91.67%, 87% and 8.33%, respectively. Overall, the proposed methodology indicated a robust and reliable technique for project delay prediction that is contributing to the construction project management monitoring and sustainability.Keywords
This publication has 51 references indexed in Scilit:
- Ranking of delay factors in construction projects after Egyptian revolutionAlexandria Engineering Journal, 2013
- Formwork System Selection Model for Tall Building Construction Using the Adaboost AlgorithmJournal of the Korea Institute of Building Construction, 2011
- Death to Kappa: birth of quantity disagreement and allocation disagreement for accuracy assessmentInternational Journal of Remote Sensing, 2011
- Time–cost relationship of building projects: statistical adequacy of categorization with respect to project locationConstruction Management and Economics, 2011
- Value creating construction virtual teams: A case study in the construction sectorAutomation in Construction, 2010
- A genetic algorithm-based method for scheduling repetitive construction projectsAutomation in Construction, 2009
- Time/cost optimization using hybrid evolutionary algorithm in construction project schedulingAutomation in Construction, 2008
- The Elements of Statistical Learning: Data Mining, Inference, and PredictionJournal of the American Statistical Association, 2004
- Developing a benchmark model for project construction time performance in Hong KongBuilding and Environment, 2004
- Automated discovery of concise predictive rules for intrusion detectionJournal of Systems and Software, 2002