Integrating parts design characteristics and scheduling on parallel machines
Authors:
- Emre CevikcanECEmre Cevikcan
- M. Bulent DurmusogluMDM. Bulent Durmusoglu
- Murat BaskakMBMurat Baskak
- 1 September 2011
- journal article
- Published by Elsevier in Expert Systems with Applications
- Vol. 38 (10) , 13232-13253
Abstract
No abstract availableKeywords
This publication has 45 references indexed in Scilit:
- Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithmExpert Systems with Applications, 2009
- Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costsComputers & Operations Research, 2008
- Parallel machine total tardiness scheduling with a new hybrid metaheuristic approachComputers & Operations Research, 2007
- Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approachEuropean Journal of Operational Research, 2007
- Scenario-based planning for lot-sizing and scheduling with uncertain processing timesInternational Journal of Production Economics, 2006
- Group technology in a hybrid flowshop environment: A case studyEuropean Journal of Operational Research, 2005
- Robust scheduling of parallel machines with sequence-dependent set-up costsEuropean Journal of Operational Research, 2005
- A review of scheduling research involving setup considerationsOmega, 1999
- Early/tardy scheduling with sequence dependent setups on uniform parallel machinesComputers & Operations Research, 1999
- Scheduling and order release in a single-stage production systemJournal of Manufacturing Systems, 1995