Extraction of gold-bearing ore from under the open pit bottom at the Makmal deposit by room-and-pillar mining with backfill made of production waste
Authors:
- 1 May 2011
- journal article
- Published by Pleiades Publishing Ltd in Journal of Mining Science
- Vol. 47 (3) , 324-329
Abstract
The article describes the experience of backfilling mined-out spaces in the north and south ore lentils of the Southern orebody of the Makmal deposit, Kyrgyz Republic, through gaps in the open pit bottom by using noncommercial dump material. The theoretical and technological aspects of safe underground extraction of safety pillar are discussed.Keywords
This publication has 3 references indexed in Scilit:
- Geomechanical estimate of mining conditions at the makmal gold depositJournal of Mining Science, 2009
- The potential of technogenic formations in mines of the West SiberiaJournal of Mining Science, 2008
- Preparation of molten solidifying fill from production wastesJournal of Mining Science, 1998