Power plant maintenance scheduling using ant colony optimization: an improved formulation
- 19 March 2008
- journal article
- research article
- Published by Taylor & Francis in Engineering Optimization
- Vol. 40 (4) , 309-329
Abstract
It is common practice in the hydropower industry to either shorten the maintenance duration or to postpone maintenance tasks in a hydropower system when there is expected unserved energy based on current water storage levels and forecast storage inflows. It is therefore essential that a maintenance scheduling optimizer can incorporate the options of shortening the maintenance duration and/or deferring maintenance tasks in the search for practical maintenance schedules. In this article, an improved ant colony optimization-power plant maintenance scheduling optimization (ACO-PPMSO) formulation that considers such options in the optimization process is introduced. As a result, both the optimum commencement time and the optimum outage duration are determined for each of the maintenance tasks that need to be scheduled. In addition, a local search strategy is presented in this article to boost the robustness of the algorithm. When tested on a five-station hydropower system problem, the improved formulation is shown to be capable of allowing shortening of maintenance duration in the event of expected demand shortfalls. In addition, the new local search strategy is also shown to have significantly improved the optimization ability of the ACO-PPMSO algorithm.Keywords
This publication has 14 references indexed in Scilit:
- Ant colony optimization for resource-constrained project schedulingIEEE Transactions on Evolutionary Computation, 2002
- Theoretical and numerical constraint-handling techniques used with evolutionary algorithms: a survey of the state of the artComputer Methods in Applied Mechanics and Engineering, 2002
- – Ant SystemFuture Generation Computer Systems, 2000
- A Practical Model for Generator Maintenance Scheduling with Transmission ConstraintsElectric Machines & Power Systems, 2000
- A Tabu search algorithm for maintenance scheduling of generating unitsElectric Power Systems Research, 2000
- Ant Colony Optimization for the Total Weighted Tardiness Problem2000
- Genetic Algorithms for Scheduling Generation and Maintenance in Power Systems1999
- Ant colonies for the travelling salesman problemBioSystems, 1997
- Ant colony system: a cooperative learning approach to the traveling salesman problemIEEE Transactions on Evolutionary Computation, 1997
- Maintenance scheduling by using simulated annealing method (for power plants)IEEE Transactions on Power Systems, 1991