Seismic performance of fabricated continuous girder bridge with grouting sleeve-prestressed tendon composite connections
Authors:
- 1 June 2023
- journal article
- research article
- Published by Springer Nature in Frontiers of Structural and Civil Engineering
- Vol. 17 (6) , 827-854
Abstract
No abstract availableKeywords
This publication has 36 references indexed in Scilit:
- Seismic evaluation of grouted splice sleeve connections for reinforced precast concrete column–to–cap beam joints in accelerated bridge constructionPCI Journal, 2015
- Seismic performance of precast hollow bridge piers with different construction detailsFrontiers of Structural and Civil Engineering, 2014
- Feasibility study of grouted splice connector under tensile loadConstruction and Building Materials, 2014
- Experimental and numerical study of a self‐centering prestressed concrete moment resisting frame connection with bolted web friction devicesEarthquake Engineering & Structural Dynamics, 2013
- Two-plastic-hinge and two dimensional finite element models for post-tensioned precast concrete segmental bridge columnsEngineering Structures, 2013
- Behavior of Segmental Precast Posttensioned Bridge Piers under Lateral LoadsJournal of Bridge Engineering, 2012
- Analysis of segmental piers consisted of concrete filled FRP tubesEngineering Structures, 2012
- Design, Modeling, and Experimental Response of Seismic Resistant Bridge Piers with Posttensioned Dissipating ConnectionsJournal of Structural Engineering, 2007
- Seismic Performance of Segmental Precast Unbonded Posttensioned Concrete Bridge ColumnsJournal of Structural Engineering, 2007
- Effect of Post-Tensioning Steel Anchorage Location on Seismic Performance of Exterior Beamto- Column Joints for Precast, Prestressed Concrete MembersPCI Journal, 2007