Development of Reinforced Concrete Arch Bridges in the U.S.: 1894–1904

Authors:
  • JDJr.; Robert J. Kapsch; Robert LoConte; Bruce W. Mattheiss; and Steven M. Pennington Edited by Bernard G. Dennis
    Jr.; Robert J. Kapsch; Robert LoConte; Bruce W. Mattheiss; and Steven M. Pennington Edited by Bernard G. Dennis
  • D4Dario A. Gasparini11Professor, Department of Civil Engineering, Case Western Reserve University, Cleveland, Ohio 44106
    Dario A. Gasparini11Professor, Department of Civil Engineering, Case Western Reserve University, Cleveland, Ohio 44106

Abstract
In 1894 Fritz Von Emperger presented a paper on concrete-iron bridges at the International Engineering Congress. Von Emperger showed examples of European reinforced concrete arch bridges and extolled the qualities of German cement. He described tests that showed the superior performance of the Melan reinforcing system, which was patented in the U.S. in 1893. Late in 1894, Von Emperger built the first Melan arch in the U.S. at Rock Rapids, Iowa. Although a few reinforced concrete arch bridges had been built in the U.S. prior to 1894, Von Emperger's efforts in promoting the Melan system as a "permanent", cost-effective alternative to products of bridge companies initiated a sustained, rapid development of technologies related to reinforced concrete arch bridges. Reinforced concrete systems were enthusiastically adopted and entrepreneurial designers such as Edwin Thacher and Daniel Luten developed and patented their own proprietary systems. Engineering literature of the period contains revealing opinions on the nature of composite action, advantages and disadvantages of various arch forms, "proper" shapes for arch axes and suitable design methods. The evolution of reinforcing systems is followed and pioneering examples of reinforced concrete arch bridges are given.