The ion injector chain for the LHC has to be adapted and modified to reach the design beam parameters. Up to now an ECR4 delivered the ion beam for the SPS fixed target physics programme. This source will be replaced by a higher intensity source to produce the Pb 27+ ion current required to fill the Low Energy Ion Ring (LEIR). The new ion source will be based on the Grenoble Test Source which was itself based on empirical scaling laws derived from the Framework 5 “Innovative ECRIS” collaboration. This paper will describe the design principle, the commissioning timetable and the present status of the source development.