Minimizing the makespan in the permutation flowshop problem with minimal and maximal time lags
Authors:
- 1 March 2011
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Abstract
In this paper, we investigate the m-machine permutation flowshop scheduling problem where minimal and maximal time lags are required between consecutive operations of each job. Such problem has not been studied extensively in the scheduling literature. The objective is to minimize the makespan. We propose a mathematical formulation for this problem; it is solved by running commercial software CPLEX using many instances randomly generated. Then, we propose a Genetic Algorithm and we perform a computational analysis. The results of numerical experiments show that our proposed Genetic algorithm performs very well.Keywords
This publication has 8 references indexed in Scilit:
- Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion timesInternational Journal of Production Economics, 2008
- Two new robust genetic algorithms for the flowshop scheduling problemOmega, 2006
- Permutation flowshop scheduling problems with maximal and minimal time lagsComputers & Operations Research, 2006
- Minimizing Makespan in a Two-Machine Flow Shop with Delays and Unit-Time Operations is NP-HardJournal of Scheduling, 2004
- Improved genetic algorithm for the permutation flowshop scheduling problemComputers & Operations Research, 2004
- Shop Problems With Two Machines and Time LagsOperations Research, 1996
- An application of genetic algorithms for flow shop problemsEuropean Journal of Operational Research, 1995
- Sequencing n Jobs on Two Machines with Arbitrary Time LagsManagement Science, 1959