Abstract
The flexible traction power supply system (FTPSS) integrates back-to-back converter, hybrid energy storage system (HESS) and PV generation system will be an important part of the smart railway. The FTPSS not only cancels the neutral zone, but also facilitates the utilization of regenerative braking (RB) and renewable energy, but the random fluctuation of PV and the sudden change of traction load will exert influence on the safe and efficient operation of the FTPSS. To improve the benefits of FTPSS, and compensate the imbalance between supply and demand in short-term operation, a multi-time scale optimal dispatch method is proposed for flexible railway energy management (FREM), which integrate day-ahead dispatch and intra-day feedback correction. During the day-ahead dispatch, the minimizing operating costs problem is formulated as a mixed linear programming model by coordination between HESS, RB and PV output. For intra-day energy adjustment dispatch, a rolling optimization based on model predictive control combined with feedback correction method is proposed, with aim of minimum operation deviation of FTPSS for thanks to adjusting the HESS dispatch plan drew up at day-ahead. Finally, the effectiveness of the proposed FREM control strategy is verified by the detailed real case study of a railway line in China.
Funding Information
  • National Natural Science Foundation of China (51877182)

This publication has 38 references indexed in Scilit: