Solving Fuzzy Job Shop Scheduling Problem Based on Interval Number Theory
Authors:
- 6 November 2012
- book chapter
- Published by Springer Nature
- p. 393-401
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Solving fuzzy job shop scheduling problems using random key genetic algorithmThe International Journal of Advanced Manufacturing Technology, 2009
- Single-machine scheduling with flexible and periodic maintenanceJournal of the Operational Research Society, 2006
- Applying the fuzzy ranking method to the shifting bottleneck procedure to solve scheduling problems of uncertaintyThe International Journal of Advanced Manufacturing Technology, 2006
- Fuzzy priority rule for job shop schedulingJournal of Intelligent Manufacturing, 2004
- Job shop scheduling using fuzzy logicThe International Journal of Advanced Manufacturing Technology, 2004
- Scheduling job shops with uncertainties2002
- Fuzzy job-shop scheduling based on ranking level (λ, 1) interval-valued fuzzy numbersIEEE Transactions on Fuzzy Systems, 2002
- On comparing interval numbersEuropean Journal of Operational Research, 2000
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithmsEuropean Journal of Operational Research, 2000
- An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedateComputers & Industrial Engineering, 1999